Greencoat Capital needed substantial utility infrastructure to power a 22-hectare vegetable growing facility in the fastest possible time frames. This was one of the largest facilities of its kind in the UK and has the capacity to grow 10% of cucumbers consumed in Britain.

  • Design & Build of High Voltage Grid Connections
  • High Voltage Electrical Design Services

An on time and on budget delivery

0 KM

of 33kV electric cable

0 kV

dual circuit substation, design and installed

Client Greencoat Capital
Location Cambridgeshire
Benefits delivered
  • Delivered on time and on budget
  • Significant efficiencies achieved through in-house design and construction
  • Construction of a 33kV substation completed in seven weeks
  • Installed alongside the major A10 trunk road to minimise the impact on the local environment

33kV substation completed in more than half of standard timeframes

True added value project delivery

Through a collaboration between its group companies, the construction of a 33kV substation was completed in seven weeks, more than half the time normally expected for this type of High Voltage electrical structure.

As well as 6.5km of 33kV electric cable, our in-group engineers laid 12.8km of gas infrastructure and 2.5km of water infrastructure and through villages and alongside the major A10 trunk road, minimising the impact on the local environment and the Cambridgeshire countryside.

Dunamis overcame several challenges to successfully deliver the infrastructure, in addition to pandemic-influenced, UK-wide material supply issues, which further focused efforts to complete the project on schedule.

“Assembling an experienced and collaborative supply chain is an essential part of the delivery of this ambitious project. Dunamis’ ability to be flexible and meet deadlines with the successful completion of the greenhouse’s utility requirements ensured the development stayed on track and enabled our other contractors to also maintain the project’s timeline.”

Greencoat Capital

Dunamis can deliver the best, value engineered solution for your next development

Discover how our team of experts can support you with a true turnkey, added value, High Voltage design and build solution for your next project.

Let's discuss your next project